Machine room, part 8: by 31 March 2027, data centre operators must publish their figures for calendar year 2026 and submit them to the federal government. Annex 3 of the Energy Efficiency Act requires annual values: total electricity, share of renewable energy, waste heat, power usage effectiveness, water usage. Whatever is missing in March can no longer be measured after the fact.

Four months from now it is due: by 31 March 2027, data centre operators must report their figures for 2026. Most think of it in March. But measuring has to happen all year, including now, in November, and at midnight on New Year's Eve.

What section 13 of the Energy Efficiency Act requires

Section 13(1) of Germany's Energy Efficiency Act (EnEfG) obliges data centre operators to publish information about their data centre in accordance with Annex 3 for the previous calendar year and submit it to the federal government by the end of 31 March each year. Submission is to use an electronic template provided by the federal government.

Two words in it are often overlooked. "Publish" means the figures are not just a report to an authority but public. And "previous calendar year" means the report in March 2027 describes the year 2026, from January to December.

Under section 20(2), the first reports were due by 15 May 2024 or 1 July 2025, depending on size. Since then, the annual rhythm applies. Anyone who fails to submit information, or submits it incorrectly, incompletely or late, commits an administrative offence under section 19. The fine can be up to 50,000 euros.

What Annex 3 asks for

Annex 3 has two parts. The first is general information: name, owner and operator, size class, postcode, building area, rated IT connected load and the non-redundant rated connected load. The second is operating data for the last full calendar year:

  • Total electricity consumption including self-generation, total grid purchase and feed-in to the grid
  • Share of renewable energy in total electricity consumption
  • Quantity and average temperature of waste heat released to air, water or ground
  • Quantity and temperature of waste heat delivered to heat consumers
  • Quantity of data stored and processed in the data centre
  • Power usage effectiveness (PUE), share of reused energy, cooling efficiency and water usage, each according to the DIN EN 50600 series

Almost all of these are annual values. A PUE from one measuring day in February is not an annual value, which was the subject of the first part.

Where it breaks down in March

  • The meter reading from 1 January is missing. Without a start and end reading there is no annual consumption, only an estimate. 1 January 2027 is the end reading for 2026 and the start reading for 2027.
  • There is no water meter. Water usage requires measuring the water the cooling consumes. If cooling is on the building's main connection, the value cannot be separated from the rest of the building.
  • Waste heat is only "measurable or estimable". Annex 3 allows estimates. Then it should be settled by March how the estimate was made, and it should be the same every year.
  • Nobody knows who reports. Facilities, IT operations and energy management each hold part of the figures. Whoever collects them in March finds the gaps too late.

The amendment of the Energy Efficiency Act exists as a government draft and has not yet been promulgated. Until then, the 2023 version applies. For the report due 31 March 2027, that means Annex 3 in its current form.

How isidaten maps this

In isidaten's data centre compliance module, an indicator year holds PUE, share of reused energy, share of renewable energy, cooling efficiency and water usage together with measurement method and coverage. The report file for 31 March is closed with four-eyes approval and sealed, and there is a warning when a reporting deadline approaches or has passed.

The test question

Who reads the meters on 1 January, and which value from Annex 3 would only be an estimate today?

Product-related assessment, not legal advice.

Sources

Energy Efficiency Act (EnEfG) of 13 November 2023, section 13(1), section 14, section 19(1) no. 6 and (2), section 20(2) and Annex 3, retrieved 18 November 2026. The DIN EN 50600 standards named in Annex 3 are protected by copyright and are not quoted here.

In the next part: who was at the rack? Access that can be evidenced. The previous part: Colder is not safer: the supply air temperature.