The German Energy Efficiency Act requires data centres to report metrics, evidence and a submission by 31 March. The difficulty rarely lies in the arithmetic but in the question of what is being measured: where does this data centre end, which distribution boards belong to it, and how was the connected load arrived at. The module therefore first keeps the data centre as a delimited object, derives its load from the DCIM distribution model, and records every figure together with its derivation. The threshold rulebook is held as data rather than program logic, and separates law in force from the government draft.
Connected load, IT load and computer room area never arrive as a bare number. Where the distribution model is missing, the module returns no value with a reason rather than a zero. A zero would be a statement, and a wrong one.
2
An empty data basis does not mean out of scope
The scope check knows four states. Where values are missing the result is "not assessable" and never an all-clear. Every rule is evaluated with its legal reference, target value, actual value, the origin of that actual value and the distance to the threshold.
3
Every metric carries its measurement method
PUE, WUE and the energy volumes come with a standards reference, measurement method, coverage level, calculation path and list of gaps. PUE is delegated to the DCIM calculator or otherwise derived from the metering point register. Nothing is estimated, and manual entries are never overwritten.
4
An asserted certification falls back
For classification the check sits in the data model rather than in a form: "certified" without a named certifier is downgraded to a planning target, and for Uptime also without a certificate number. The level must match the scheme, because "Tier III" is not an EN 50600 class.
Capabilities
All capabilities at a glance
Data centre as a legal object, delimited via rooms and distribution boards
Connected load and IT load kept separately and derived from the DCIM distribution model
Threshold rulebook as data: 17 rules of the 2023 Act and 11 of the government draft, kept apart
Dated scope judgement with legal reference, target, actual and distance to the threshold
Metrics year per data centre with PUE, ERF, REF, CER and WUE
Per value: standards reference, measurement method, coverage, calculation path and list of gaps
Metering point register with evidence of measurement points as the basis for coverage
Traffic light against the rulebook with remaining time; pure threshold rules stay with the scope check
Waste heat evidence with the exemptions of Section 11(3) of the Act
Reporting file for 31 March with two-person approval and sealing
Register export for the energy efficiency register
Classification under EN 50600, ISO/IEC 22237, TIA-942 and Uptime tier, with a quality-of-claim marker
Evidence folder for certifiers
Result
A submission that does not rest on estimates, and a scope judgement that names its date and its legal reference.