Suppliers & Quality

Lift Installations

Operator duties under the German Industrial Safety Regulation, from inspection deadline to emergency call

Anyone operating a lift has duties with fixed deadlines: a main inspection by the approved inspection body at least every two years, the intermediate inspection in between, defects with deadlines by severity, an emergency call system that gets through when it matters, and an emergency plan for freeing trapped persons. The lift installations module keeps each installation with its roles, calculates the next inspection dates from every recorded inspection according to the rules of the BetrSichV and reminds the people responsible. Dates stated by the inspection body in the inspection certificate always take precedence.

BetrSichVTRBS 3121TRBS 1115 Teil 1ÜAnlG
Features

Your benefits

1

Inspection deadlines calculated, not copied

Every recorded inspection yields the next main and intermediate inspection, due at month end, with the rules for early and late inspections. A daily check reminds the responsible and the appointed person, by default 60 days ahead.

2

Defects by severity

Dangerous, safety-relevant and minor defects with their own deadlines. A dangerous defect sets the installation to shut down; it only returns to operation once a follow-up inspection confirms the repair.

3

The emergency call before the 2G shutdown

The emergency call system is recorded per installation with transmission path and network operator. The announced network shutdown dates are preloaded; twelve months before, a defect is created automatically for an emergency call still on 2G.

4

Emergency plan and checks

The emergency plan is versioned and approved, and its handover to the emergency service is recorded. The appointed person checks against a checklist including a test emergency call; anything found becomes a defect.

Capabilities

All capabilities at a glance

  • Installation register with type, design, ratings, location, operator, maintenance company and inspection body
  • Inspection types from the inspection before commissioning to the follow-up inspection
  • Deadline calculation for main and intermediate inspections, precedence for dates from the inspection certificate
  • Inspection certificate in document management, inspection sticker with month and year
  • Defects dangerous, safety-relevant and minor with default deadlines
  • Emergency call system with transmission path, network operator and 2G/3G shutdown dates
  • Versioned emergency plan with approval, handover to the emergency service and notice as PDF
  • Checks by the appointed person against a checklist, including test emergency call
  • Events such as persons trapped and malfunctions, with release time against the 30-minute target
  • Assessment of remote access under TRBS 1115 Part 1
  • Installation file as PDF with master data, deadlines, inspections and defects
  • Label with QR code that opens the installation check after sign-in
  • Links to maintenance contract, risk assessment, legal register and building plan
Result

For every installation you can see when the next inspection is due, which defects are open and whether the emergency call still gets through after the networks are switched off.

Experience Lift Installations live

Schedule a no-obligation demo – we will show you the module with your own use cases.